• Articles
  • About Us
  • Services
  • Mission and Values
  • Contact Us

Quick Economic Analysis of the Solar/BESS

To this point we have determined if the PV/BESS system could technically work to replace a standby genset, and …

5 Reasons your Power System Study Needs to be Updated

A power system is not a static system, there are always changes, some big and some small. The big changes …

BTM Solar/BESS Case Study - Finding the right size

In the previous post I introduced the example case study and ran through the initial calculations with a 8000kWdc PV …

A Case for Solar and BESS for Utility Savings

I have been thinking about behind-the-meter (BTM) solar generation for years, basically since I was at a cement plant in …

Is a Change Management Process Important?

First, what is change management or a change management process?

A change management process is a set of steps, or …

JMK Engineering Inc.

PO Box 8154
Halifax RPO CSC, NS
B3J 5L9

Phone: +1 (902) 237-9984

Get Started

  • JMK Engineering Inc.
  • ATOM FEED
    • My Socials
    • Mastodon
    • Bluesky
    • Youtube
    • Linkedin

Terms of Service

© Jeff Mackinnon. All rights reserved.

Privacy Policy